联系我们

青州统一重工机械有限公司
手机:15953665789 18706518777
电话:0536-3533567
地址:青州市弥河镇小张计村
全国客服热线:15953665789

您当前的位置:首页 > 文章中心

挖沙船是由于什么原因发生震动的?

    挖沙船是由于什么原因发生震动的?挖沙船在工作中,难免会有不灵敏的时候,有时出现不正常的振动,如果不注意会造成很大的损失,而如何更好的为用户创造更多价值是我们的共同愿望,很多时候,同样是挖沙船设备,它的使用寿命是不一样的,很多故障是我们不正确操作形成的,下面小编说下挖沙船出现振动的原因。
  它的作业方式:挖沙船作业之前,需要对设备的传动系统进行检查,然后开动后边拉输送带的柴油机,拉开离合器,启动柴油机,然后慢慢动松离合器,将转速调至正常。
  接着再启动前拉链斗的柴油机。两柴油机起动后。将转速调至需要速度。然后松开大臂刹车。慢慢将其放下,等料斗内沙子多于三分之二时,可停止下放,待至三分之一时再资助下大臂。当大臂与水面成45度角时,在5米左右,应停放大臂。
  这时料斗内沙子的多少改用牵引控制,前进时要查看斗内沙子的多少而定,前进撤退要灵活。以上就是挖沙船的工作方式了。
  如遇沙层塌方机械工作吃力或拉不动时就要把牵引绳松开,使船向撤退直至挖动为止。挖沙船作业注意事项如水下遇有大石头或泥层,船体会有剧烈的振动现象,挖沙船这时应立刻提起挖沙大臂,避过障碍物再进行。
  以上就是挖沙船震动的原因,你get到了吗,希望会对你们有所帮助。如遇到这种情况或其他问题,分析原因然后解决问题,相信会从中学到很多知识。

挖沙船

     Dredgers at work, there will be no time sensitive, sometimes the vibration is not normal, if not pay attention will cause a great loss, and how to create more value for users is our common desire, a lot of the time, it is also the dredging equipment, the service life is not the same. A lot of the fault is that we do not correct operation form, the following small said reasons of dredger vibration appear.
Its mode of operation: before the dredging operation, need the transmission system of the equipment to check, and then start the pull back conveyor belt of diesel engine, pull the clutch, start the engine, and then slowly moving loose clutch, the speed adjusted properly.
    Then start the diesel engine before the zipper bucket. After starting of two diesel engine. Rotate speed to desired speed. Then release the big arm brake. Slowly put it down, and wait for more than 2/3 of the sand in the hopper, you can stop the transfer, until 1/3, and then funded the big arm. When the big arm and the water surface become 45 degrees angle, in 5 meters or so, should park the big arm.
At this time, the number of sand in the hopper is controlled by traction, and the sand in the bucket should be checked when moving forward. The above is the dredging work.
     In case of mechanical sand cave strenuous work or pull when the traction rope is loosened, the boat to retreat until it stops digging. The dredging operation precautions in case of large stones under water or mud, the ship will be severe vibration phenomenon, should immediately lift dredger dredging arm, then avoid obstacles.
     The above is the reason of dredging vessel motion, you get to me, I hope to help you. If this situation or other problems, analysis of the reasons, and then solve the problem, I believe will learn a lot of knowledge.