淘金船是一种水上淘金设备,它在对河沙提取的同时,对河沙中的沙金进行提取,不仅实现了资源的有效利用,而且收获了了丰厚的利润,为企业创造了更多的经济效益。淘金船是在挖沙船的基础上,加装选金设备而成的一种机械设备。淘金船主要由挖掘系统、选矿设备、尾矿排弃系统、供水及中矿输送系统、绞车系统、起重设备、船体及船体设施、上部钢结构及房屋、桩柱设置、压力系统及供电与电气控制系统等结构组成。
淘金船的挖掘系统由挖斗链、主驱动、斗架等组成,主要用于完成表土和矿砂的采挖作业。淘金船的选矿设备由圆筒筛、选金组合螺旋溜槽、粗选设备和精选设备组成,用于完成矿砂的洗矿、碎散、筛分、粗选和精选作业。淘金船的尾矿排弃系统由胶带输送机、砂泵等组成,用于输送排弃砾石和尾矿。淘金船的供水及中矿输送系统由水泵、砂泵、水管、砂泵管管系等组成,用于供水和中矿矿浆输送。
淘金船的绞车系统由斗架提升绞车、首绳绞车、提锚绞车、横移绞车和登岸桥绞车等组成,用于进船、调船、系船、船的横移及斗架、桩柱、登岸桥的升降等。淘金船的起重设备:由船首起重机、主驱动间起重机和其他起重设备所组成,用于完成各种起重工作。淘金船的船体及船体设施由平底船和各种船体设施所组成,用于安装采金船的各种设备和结构,使采金船能平稳地飘浮于水上作业。
淘金船的上部钢结构及房屋由主桁架、前桅架、后桅架、操纵室、办公室、厂房、楼梯走台和登岸桥等组成,用于支撑和布置各种设施和设备,保证采金船在作业时操作方便,安全可靠。淘金船的桩柱设置由桩柱、缓冲装置、滑轮等组成,用于采金船采金时的船体定位和移步。淘金船的压力系统由空气压缩机、贮气罐、气压原件及管路等组成,用于给斗架提升机、提锚机等设备气闸刹车提供压力能源。淘金船的供电与电气控制系统由供电、电力拖动、电气控制及照明等部分组成,用于驱动控制采金船各种电气设备及全船照明等。
The Gold Digger is a kind of water gold rush equipment, it is extracted from the river sand at the same time, to the alluvial sand in the river, not only realizes the effective utilization of resources, but also harvest the lucrative profits, for the enterprise to create more economic benefits. The gold rush is a mechanical equipment that is built on the basis of dredging and loading of the gold-picking equipment. The gold rush is mainly composed of mining system, beneficiation equipment, tailings dump system, water supply and conveying system, winch system, lifting equipment, hull and hull facilities, superstructure and housing, pile-pillar setting, pressure system and power supply and electrical control system.
The excavation system of the Gold Digger is composed of bucket chain, main drive, bucket rack and so on, mainly for finishing the excavation of topsoil and ores. The beneficiation equipment of the gold Digger consists of a cylindrical sieve, a selection of gold combination spiral chute, a coarse selection equipment and a selection of equipment for completing ore washing, crushing, screening, coarse selection and selection of operations. The tailings dump system of the Gold Digger is composed of belt conveyor, sand pump, and so on, for conveying and dumping gravel and tailings. The water supply and the conveying system of the gold-rush ship consist of pumps, sand pumps, pipes and pipes, and so on, for the conveyance of water supply and ore pulp.
The winch system of the Gold Rush is composed of the lifting winch, the first rope winch, the lifting anchor winch, the transverse shifting winch and the landing bridge winch, etc., used for entering the ship, adjusting the ship, the mooring, the transverse movement of the vessel, the bucket rack, the pile pillar and the landing bridge. The lifting equipment of the Gold Digger: the Bow Crane, the main driving crane and other lifting equipment, used to complete a variety of lifting work. The ship's hull and hull facilities consist of a flat-bottomed vessel and a variety of hull facilities, which are used to install the various equipment and structure of the gold ship, so that the gold ship can float smoothly on the water.
The upper steel structure and housing of the gold-rush ship consist of the main truss, the front mast frame, the rear mast, the control room, the office, the building, the stair walk and the landing bridge, which are used to support and decorate the facilities and equipments, and ensure the safe and reliable operation of the gold ship. The pile pillar of the gold rush is composed of piles, buffers, pulleys, and so on, for the Hull positioning and the shift of gold mining. The pressure system of the Gold Digger is composed of air compressor, gas storage tank, air pressure original and pipeline, and is used to provide pressure energy for the brake braking of the bucket hoist and the lifting anchor machine. The power supply and electrical control system of the gold-rush ship consists of power supply, electric drive, electric control and illumination, which is used to drive the control of all kinds of electric equipments and all ship lighting.